Accessible, Removable, Recyclable Walls For Maximum Facility Management 

Patented Process

Shown below is the installation process for our patented Green-Zip process.

 

Installation  

Step 1

Attach drywall to metal studs with removable screws at panel edges as specified. At "middle" studs apply two parallel 3 inches long & about ¾ inch diameter beads of releasable adhesive about every 3 feet on middle stud.

 

Step 2A

Omit under layer of joint compound

Step 2B

Apply self-adhesive Green-Zip Tape™ directly over Screws & Joint as shown above. Only Green-Zip Tape™ passed tests to deconstruct when mud "fully" cured. It is the only tape to qualify for license to use Patent protected methods.

Step 3

Float the finish

Coat of mud compound over the Green-Zip Tape™  

Step 4

Leave a "tab" at the end of the Green-Zip Tape un-floated; & covered by carpet or folded under base    

 

 

 

 

 

With the final result being a high quality finish to the wall 

 

Disassemble

 

 

Step 1

Remove Wall Base (or Carpet) to expose the "pull-tab" that was left un-floated   

 

 

 

Step 2

Grasp the "pull-tab" at the floor and pull or "zip" up the

Green-Zip Tape™

 

 

 

 

Step 3

"zip up" the Green-Zip Tape™ to expose the screws  

 

 

 

 

 

Step 4

Remove the screws.

 

 

 

 

 

Step 5

Remove the gypsum panels and stack on cart for reuse.

 

 

 

 

Step 6

Remove the studs and stack on cart for reuse.